Reinforcement Schedule Calculator

Analyze reinforcement schedules and get evidence-based recommendations. Plan schedule thinning and generate variable sequences.

1

Select Schedule Type

2

Enter Parameters

Fixed Ratio: Reinforcement delivered after a fixed number of responses.

responses

FR Characteristics

  • -High, steady response rate
  • -Post-reinforcement pause (especially at higher ratios)
  • -Ratio strain possible if ratio too high

Best For

  • Building fluent responding
  • Tasks with clear response units
  • Production-based tasks

Considerations

  • -Start with low ratios (FR1-FR3) and thin gradually
  • -Watch for ratio strain signs
  • -Pair with varied reinforcers

Master ABA Concepts

Practice with flashcards covering schedules of reinforcement and all BCBA exam content areas.

Try TAFMEDS Free